Multi-storey steel structure system

Multi-storey steel structure system

Published:2014-09-06   Source:系统管理员    Click:
Features Parameters

Characteristics of multi-storey steel structure workshop
1. Adoption of lightweight enclosure structure
The profiled steel plate and sandwich metal plate with color coating have substituted masonry enclosure wall body of conventional multi-storey workshop and have become the indispensable enclosure structure of multi-storey light steel workshop thanks to their advantages of light dead weight, good heat insulation and isolation effect, quick installation speed and nice appearance. Lightweight enclosure structure is helpful to substantially reduce the dead weight of the structure and reduce the requirements for
2. Large floor height and size of column grid
Relative to multi-storey civil building, the workshop of multi-storey steel construction has a relatively big floor height, which is usually 4~8m. For example, the height of a 4-storey workshop is equivalent to 8-storey civil building. Multi-storey workshop of steel construction has big internal space, and the column spacing is mostly 6~12m, and sometimes reaches 18m.
3. Big live load
Due to the requirements of raw material stacking and production process, the live load of multi-storey workshop of steel construction is mostly 2.5~20 kN/m2, which is far larger than that of multi-storey civil building.
4. The suspended loads of multi-story workshop with more suspended and concentrated loads mainly include installing load, loads of process streamline, hoisting crane and ceiling, etc., whereas the concentrated load mainly includes equipment dead weight, and sometimes the vibrating load of equipment.
5. Staggered layer arrangement of structure
The structures of multi-storey general building are mostly of symmetric arrangement, whereas for the multi-storey light steel workshop, there often appears the phenomenon of structural staggered layers in order to satisfy process requirements, this makes the floor slab is no longer complete, makes the uniformity of the mass distribution along the height destroyed and may cause twist under the action of earthquake. And due to “short-column effect”, this makes the horizontal shear become the control factor of some column segments.
6. Short construction period
Compared to the conventional reinforced concrete workshop, the design, production and construction of multi-storey workshop of steel construction tend to be integrated, plus there is no welding on site and no wet operation, all these are helpful to shortening the construction period and speeding up fund circulation.